PCM Development/Palladio Concall/Minutes 20210810
Agenda
- JIRA issues status Dev Board
- When to do next release
- Java 17 (LTS) to be released in September
- Palladio 5.0 does not work properly in Eclipse 2021-06
Participants
- Dominik
- Jörg
- Martina
- Sebastian
- Snigdha
- Stephan
- Yves
Sprint
- Not much done, Sprint will be extended/copied
Release
- Ideally with new Java 17 (LTS) in September (then, Java 11 is also not supported any longer)
- Release with current Eclipse version at that point of time so everything is compatible to current state
- Releases:
- 5.2: Around October: Eclipse 2021-12 with Java 11 (for release), ensure compatibility with Java and then switch to Java 17 on nightly; already ensure that Java 17 works.
- 5.3: Switch to Java 17
- TODO (next ConCall)
- Make appointment for testing day
EDP2
- Capturing measurement data:
- Can there be multiple measurements for the same point of time (for the same metric)?
- Possible problems: Infinitesimally small time (float in delays too small), delays not modelled (e.g. passive resource is acquired and immediately released)
- Apart from pathological cases, the assumption that there are not multiple measurements for the same point of time is valid.
- Can there be multiple measurements for the same point of time (for the same metric)?