PCM Development/Palladio Concall/Minutes 20180917
Participants
- Uni Stuttgart
- Markus
- Steffen
- Floriment
- FZI
- Stephan
- KIT
- Dominik
- Maximilian
Protocol
- Follow up of Simulizar workshop
- State of documentation. Check in next Concall:
- Power Analysis / Action Model
- ATs / Workshop Documentation
- Creation of new ATs? (Markus)
- Last state: student worker is on it and has completed it but not reviewed yet
- Arbitrary Load Balancing Strategies? (Patrick Firnkes)
- Prototype of next gen Simulizar (Sebastian)
- TODO Sebastian: hand over to Steffen before presentation
- Possible student's theses (Max)
- No update
- Status of removal of IModelAccess (Max)
- Pull request to be reviewed by Steffen.
- Repair broken IResourceUriMeasuringPoints (Markus)
- No update
- Impliciation of removing PCM measuring points without additional information (Dominik)
- No update
- Assign tasks for cleanup of top 10 classes (wrt code)
- TODO Sebastian: Statistic of top 10 classes.
- Discussion about changes that shall be released
- State of documentation. Check in next Concall:
- Status update
- BWCloud (Max)
- OAuth2 for authorization (Dominik)
- No update
- Architectural Templates (Sebastian/Stephan)
- Cleanup repository:
- Stephan/Sebastian make draft of the cleanup. Will be reviewed by Markus (and Stephen)
- Cleanup will be coupled with migration to Tycho
- Category on update site is "supporting" but better matches "addon"
- Either add-ons or core (since Palladio depends on ATs). Decision: addon
- How to deliver addons for ATs (such as [1])
- Super category: Add-on AT catalogues:
- add ATs under this category
- Sebastians ATs also in this category
- Cleanup repository:
- JIRA performance (Stephan)
- was faster on bwCloud, so new VM or migration to bwCloud might be an option
- Stephan will talk to Eric: Use VM or use bwCloud?
- Initial results might be biased, because there was probably little load on bwCloud at that point.
- Pricing still unclear.
- Process for code contributions (Stephan)
- enforce pull requests including reviews and build?
- reject breaking commits
- build: security concerns; Stephan's student will work on it, timeline: 4 months
- decision: more structured process favorable
- TODO Stephan: disable push to master
Next Concall
Next concall: 08.10.2018