PCM Development/Palladio Concall/Minutes 20180813
Participants
- Uni Stuttgart
- Markus
- Steffen
- FZI
- Christian
- Max
- Sebastian
Follow up of Simulizar workshop
State of documentation (initial version was due to the concall)
- Poweranalysis done (Christian), Action model and Extension done
- Usage evolution, no information
- Cloud metrics done
- Monitoring Repositories: students are working on it; finished by the end of the semenster
- ATs
- Markus: Existing documentation extended by explanation how to create new ATs
- Word-based tutorial migrated to wiki
- Technical page (Transformations)(Sebastian): Initial version created; finished by next concall
- Native simulation of events(Dominik): No information / delayed until implementation available
- Arbitrary load balancing strategies (Patrick Firnkes): no information
Prototype of next gen Simulizar (Sebastian)
- Progress on conceptual level
- Currently: Paper for SSP
- New time estimate: Next concall
Possible student's theses (Max)
- Priority-based selection of reconfiguration strategies
- More time needed to go into conceptual questions (Max)
Status of removal of IModelAccess (Max)
- Done (Max)
- Next step: Validate with transient effect simulation and create pull request (Max)
Repair broken IResourceUriMeasuringPoints (Markus)
- No progress
Impliciation of removing PCM measuring points without additional information (Dominik)
- No information
Assign tasks for cleanup of top 10 classes (wrt code)
- No progress
- TODO Sebastian: Create statistic of top 10 classes in SimuLizar (w.r.t. LOC)
Discussion about changes that shall be released
- In view of less progress postpone to next concall
Status update
BWCloud (Max)
- No progress
- BWCloud received upgrade (10 times the resources it had before)
- Projects are allocated with less resources
OAuth2 for authorization (Dominik)
- No news
== Architectural Templates
- Cleanup repository - No objections
- Move examples
- Adapt naming
- Reclassify "supporting" to "addon"
- TODO: Design naming scheme for addons of extensions
JIRA performance
- was faster on bwCloud, so new VM or migration to bwCloud might be an option
- no objections in general
Next concall
- 10.September 2018